How to budget a shoot
Week three of Abby Film School is the budget. By now the script has been read, broken down, and laid out on a board. The budget is where the board turns into a number, and the number is what everyone outside the production will judge you by. This week: how a topsheet is built, where every line really comes from, and the lines first-time producers forget.
How it usually works
A film budget has two layers. The topsheet is the one-page summary: a dozen or so accounts with a total each. Above the line sits the script, the producers, the director, and the cast. Below it comes production, then post, then the costs that belong to no department: insurance, legal, and contingency. Under the topsheet is the detail, where every account breaks into lines, and every line is the same small sum. A quantity, times a rate, times a number of days or weeks.
Those days come from the board. A twelve-day schedule means twelve days of crew, twelve days of camera rental, twelve days of meals, and a certain number of location moves. Change the board and the budget should change with it. On most productions it does not, because the budget lives in one program and the schedule in another, and someone re-types the days by hand every time the board moves.
The traditional tools are built for the detail. Budgeting software holds thousands of accounts, union rate books, fringe tables, and global values for the shoot days so one change ripples through. It is powerful, it costs real money, and it assumes you already know what belongs on every line. First-time producers rarely do, so the first budget is usually a template from someone else's film with the numbers changed.
What a topsheet needs to be believed.
- Days from the board: every per-day line should trace to a shoot day someone can point at.
- Rates with a source: a rate card, a quote, a deal memo, or a named assumption. "Industry standard" is not a source.
- The fringes: payroll taxes, workers' comp, and union benefits on top of every wage. Twenty percent or more on labor, and missing from most first budgets.
- A contingency: ten percent of the below-the-line total, held back for the day the weather turns.
- A target: the number you can actually raise. A budget with no target is a wish list.
- Notes on the assumptions: the two or three lines that would move most if you are wrong, and why you believe them.
The lines first-time producers forget
Every experienced line producer carries a list of the costs that never make the first draft. Here is the short version.
- Payroll fringes. Taxes, workers' comp, and pension and health on union work. The wage is only the start. Budget fringes as a percentage on every labor line, and the labor lines are most of the budget.
- Insurance. General liability, equipment, workers' comp, and a certificate for every location. No rental house hands over a camera without it, and no location signs without it.
- Meals and craft service. Two meals a day, every person on set, every day, plus the water, the coffee, and the table that keeps a crew moving. On a small shoot it is one of the larger lines.
- Transport, parking, and gas. Trucks, vans, parking for the whole unit, mileage, and the tickets.
- Data. Hard drives in duplicate, someone to wrangle them, and the backup you will be glad you paid for.
- Location fees and permits. The fee, the permit, the officer the city requires, and the neighbor you pay for the noise.
- Prep and wrap days. Crew are paid to load in before day one and to return gear after the last day. Rental houses charge for those days too.
- The rest of post. Color, the sound mix, music licensing, titles, captions, deliverables, and the festival fees that come after.
- Legal. Clearances, the agreements, and errors and omissions insurance when the film is sold.
- Contingency. The one line that protects every other line.
The same job in Abby
Budget lives in the Money section, and it is built from the breakdown and the board you already have:
- Draft the budget from the board. Abby reads the breakdown and the schedule and writes a first-pass budget line by line, in standard categories: cast, crew, locations and permits, camera, grip and electric, art, wardrobe, sound and music, transport and meals, post, insurance, contingency. Each line carries a short note on the assumption behind it, so you can see where the number came from.
- Set a target. Give Abby the number you can raise and the topsheet tells you how far off you are, in dollars, at the top of the page.
- Change a line and the total follows. Edit any estimate, add lines of your own, delete what does not apply. Your lines stay yours when Abby redrafts.
- Export it. A topsheet PDF for a financier or a partner, and a CSV for the accountant.
- Ask her about it. "What would this cost at eight days instead of ten" and "where is the fringe" are questions you can ask in plain words, with the board and the budget in front of her.
The budget is on the paid plans, from $19 a month. The breakdown and the board it is built from are free, so by the time you need the number, the hard part is already done.
Three habits for the budget
- Budget from the board, never before it. A number with no days under it is a guess.
- Put fringes and contingency in on day one. They are the two lines that make a budget real, and the two most often cut to make a number look good.
- Keep the first draft. Every later version is measured against it, and the distance between them is what you learned.
What is coming
Next week in Abby Film School: finding the money. How a financing pipeline is built from the budget, and who to ask first.